Reset change tracking
An outbound port that exports incrementally only sends what has changed since its last run. Outbridge tracks that position with a watermark — the change-tracking version the entity had reached when the port last exported successfully.
Reset change tracking moves that watermark. Use it when the watermark no longer reflects what the receiving system actually holds:
- The target system was reloaded, restored from a backup, or rebuilt, and needs every record again.
- A failed or partial export left the receiving system missing records that Outbridge already counted as sent.
- A port was pointed at a new destination that has never received anything.
- Conversely, an environment was refreshed from production and you want to suppress a re-export of history that the target already has.
Where to find it #
Open the diagnostics console and select Maintenance > Change tracking > Reset change tracking.
The command requires the Reset change tracking privilege, which is included in the Outbridge maintain role, and the Outbridge – Standard configuration key. See User roles, access, and permissions.
Modes #
- Baseline at current version — records the current change-tracking version as the new watermark. The next incremental run exports only changes made after this moment. Everything that changed before it is treated as already delivered.
- Force full export on next run — removes the watermark entirely. The next incremental run exports everything the entity holds.
Choose the mode deliberately. Force full export on a large entity produces a full extract on the next run, with the volume and duration that implies for both systems; Baseline silently discards anything not yet delivered.
Run it #
- Open the diagnostics console and select Maintenance > Change tracking > Reset change tracking.
- Choose the Mode.
- Use Select to choose which ports to act on. The dialog takes a standard query, so you can target one port, a set of ports, or a company.
- Run it. The command runs immediately rather than through the batch queue, so wait for it to finish.
Reading the result #
Every port produces a message naming the port, the company it was evaluated in — or all companies for a port that is not company-specific — and what happened to it:
- baselined at version N (was M) — the watermark moved forward.
- watermark for entity E removed (was M); the next incremental run exports everything — the watermark was cleared.
- entity E has no watermark; the next incremental run already exports everything — nothing to do; the port was already going to export in full.
- entity E already handled through another port on data project P — two ports share a data project, and the entity was reset once rather than twice.
A closing summary reports how many ports were selected, how many watermarks were baselined, how many were removed, and how many were skipped.
When a port is skipped #
Skips are reported individually with the reason, and are normal rather than errors. A port is skipped when:
- it is not an outbound port — inbound ports have no export watermark;
- it has no data project, or its data project has no root entity;
- its data processor does not export through a data project — only Data entity ports carry change tracking;
- the data project entity is not set to incremental push — a full-push entity always exports everything;
- SQL change tracking is not enabled for the source table; or
- the entity is not an Outbridge composite entity, which are the only ones tracked.
If SQL change tracking is not enabled on the database at all, the command reports that and changes nothing.
After resetting #
Run the port and confirm the result in run history before relying on the schedule. After a Force full export, expect the record count on that first run to match the whole entity rather than the usual delta, and check that the receiving system can absorb it.