Importing two files simultaneously, and one file fails

This guide provides step-by-step instructions to identify and fix data import errors in Outbridge, specifically when one file succeeds and another fails.

Step 1: Verify folder paths #

  1. In Outbridge, go to the appropriate Data Port. 
  2. Confirm that the Inbox folder path is correctly formatted.

Example: /D365/InvoiceHeader/Outbound

  1. On your local PC storage, open a folder with files for import. 
  2. Ensure the files are placed in a correctly named folder that is integrated with cloud media like Azure shared folders (e.g., Outbound). 
  3. Place both files intended for import in this folder.

Step 2: Start the import process #

  1. In Outbridge, navigate to the relevant Data port. 
  2. Select Process port to initiate the import.

Step 3: Identify the failed file #

After the processing is finished, you can see an error message notifying you that one of the files has failed. 

  1. Go to your local PC storage and open the Error folder. The failed file is displayed in the folder. 
  2. Look to the new field on Data management – Job history File name (field can be added through personalization).
jobhistory_failed.jpg

Step 4: Review error in Job History #

  1. Go to Data management > Job history. 
  2. Find your data project and select Execution details. 
  3. Check the error message: “An SSIS error occurred while skipping data rows. Check if the row delimiter, column delimiter, and text qualifier characters in the file are correctly positioned.”

Step 5: Verify column structure in the file and the data project #

  1. Go to the Error folder in your local PC storage. 
  2. Open the failed file and inspect the following:  
  • Number of columns 
  • Order of columns 
  • Column names
  1. Go to your Data port and choose the relevant data project.
  2. Right-click the project and select View details.
  3. Navigate to the Entity attribute section.
  4. Compare and verify the following:
  • Number of columns 
  • Order of columns 
  • Column names

The items in your local storage file must match the items in your data project file. In this use case, the data project includes an extra column (e.g., Document date) that is missing in the source file. This mismatch causes the file to fail to be imported.

Step 6: Review staging data and error details #

  1. Go back to Data management > Job history.
  2. Choose your data project and then select Execution details. The status of the project is “Partially succeeded”.
  3. Select View staging data. 
  4. Enable the Show duplicates toggle. 
  5. Use the filter Staging to target status and set it to "is not". 
  6. From the list of filter statuses, select Completed. 
  7. Select Apply.

The list of problematic records is displayed. Read the error messages to understand the root causes.

  1. Add any missing columns to the source file or update the data project to align with the source file's structure.

General recommendations:

  • Always validate column structure before importing. 
  • Use a standardized template for all import files. 
  • Keep local file names and structures aligned with their respective data project mappings.
Book a 30-min review